Parks & Trails
Fort Fraser Trail
Fort Fraser Photo Gallery
Project Value: $5,400,000
Project Status: Completed – December 2006
Client: City of Lakeland
A/E: Dyer, Riddle, Mills & Precourt
This project involved the construction of 7.7 miles of multi-use asphalt trail along a former railroad line, including two trailheads with picnic pavilions, fencing, architectural concrete, and decorative site furnishings. The project also contained four bridges, two of which were converted from existing railroad bridges.This project was funded through several different agencies and initially budget-challenged. However, through G&R’s value engineering effort, the City of Lakeland was able to achieve their goal.
Jacksonville Riverwalk
Jax Riverwalk Photo Gallery
Project Value: $ 2,248,000
Project Status: Completed – December 2005
Client: City of Jacksonville
A/E: Akel, Logan & Shafer
The Riverwalk project was approximately ½ mile of 12’ wide brick paver path. The project schedule was extremely short as the Super Bowl was coming to Jacksonville and the path had to be complete prior to the game. The budget was also constrained and by reusing a existing dock for the pedestrian bridge foundation, the project not only met its budget but was also completed on time.
Sarasota Rails to Trail, a.k.a. Legacy Trail
Legacy Trail Photo Gallery
Sarasota, Florida
Project Value: $14,700,000
Project Status: Completed – May 2008
Client: Sarasota County
A/E: Vanasse Hangen Brustlin, Inc.*
*Design-Build Project Delivery
This project involved the design and construction of a 10 mile long multiuse trail. The project was the conversion of an existing railroad corridor. Included were 8 new bridges, over 82,000 SY of asphalt paving, arsenic remediation, and new water and reuse force mains. The project was completed ahead of schedule and under budget.
Seminole Wekiva Trail
Seminole Wekiva Photo Gallery
Seminole County, Florida
Project Value: $ 2,364,000
Project Status: Completed – August 2002
Client: Seminole County
This project involved the construction of an 8-mile asphalt multipurpose trail with equestrian path. Specifics include paving, base (recycled concrete fines), grading, drainage, exfiltration system, keystone block retaining wall, scenic overlooks, landscaping & irrigation, informational kiosk, rest areas, architectural signage, pedestrian traffic control and signalization.
Chain of Lake Trail
Chain of Lake Photo Gallery
Winter Haven, Florida
Project Value: $ 2,587,000
Project Status: Completed - December 2007
Client: City of Winter Haven
A/E: Reynolds, Smith & Hill
This project involved the construction of 3.5 miles of 12’ wide multipurpose trail. The project included two prefabricated pedestrian bridges spanning 72’ and 114’. The bridges spanned local canals and their installation was closely coordinated with the City, Water Management District, and local residents. Additional project elements include new storm drainage, relocated utilities, landscaping & irrigation, architectural signage and pedestrian traffic control.