Intersection Projects

Chickasaw Trail/Lake Underhill Intersection

  • Project Value: $ 2,397,800
  • Project Status: Completed December 2007
  • Client: Orange County
  • A/E: CPH Engineers

This project included ½ mile of road widening from two lanes to four lanes including underground utilities, curb and sidewalk, signage and landscaping. A new signalization system from the intersection was also included. The project’s MOT plan was challenging due to the shear volume of traffic.

Chickasaw/Lk. Underhill Photo Gallery

Stacks Image 1916
Stacks Image 1921
Stacks Image 1926
Stacks Image 1931
Stacks Image 1951
Stacks Image 1956
Stacks Image 1961

Collins Rd. Intersection

  • Project Value: $ 4,185,000
  • Project Status: Completed July 2006
  • Client: City of Jacksonville & JEA
  • A/E: Ayers Associates

This project included ½ mile of road widening from two lanes to four lanes and re-construction of a major intersection including underground utilities, concrete pavement, curb and sidewalk, drainage structures and pipe, fencing, gravity wall, street lighting, signalization, signage, relocation of overhead transmission lines and a 43,000 cy retention pond.

Collins Rd. Photo Gallery

Stacks Image 1963
Stacks Image 1968
Stacks Image 1973
Stacks Image 1978
Stacks Image 1983
Stacks Image 1988
Stacks Image 1993
Stacks Image 1998
Stacks Image 2003

Sand Lake Rd. & Turkey Lake Rd. Intersection

  • Project Value: $ 2,339,174
  • Project Status: Completed April 2009
  • Client: EDEN SPRINGS DEVELOPER, LLC, fka EB AT COLONY LAKES, LLC
  • A/E: HDR Engineering

This project included the intersection widening of Sand Lake Rd. & Turkey Lake Rd. in Orlando, Fl. The intersection was widened in all directions to handle the increase in traffic to the surrounding Retail Shopping Centers in the vicinity to this intersection. The project included the widening of a major intersection including underground utility installation/relocation, concrete pavement, curb and sidewalk, concrete retaining wall, drainage structures and pipe, street lighting, signalization, signage and relocating all overhead public utility lines to below ground.

Sand Lake/Turkey Lake Photo Gallery

Stacks Image 2005
Stacks Image 2010
Stacks Image 2015
Stacks Image 2022
Stacks Image 2027
Stacks Image 2032
Stacks Image 2037
Stacks Image 2048
Stacks Image 2053
Stacks Image 2060

SR A1A & Mickler Rd. Intersection

  • Project Value: $ 2,185,000
  • Project Status: Completed March 2009
  • Client: FDOT District Two
  • A/E: Comprehensive Engineering Services, Inc. (CES)

Project consisted of ½ mile of road widening from two lanes to three lanes, intersection concrete medians, signalized intersection w/ monotube assembly, three detention ponds, storm drainage system, gravity wall w/ pedestrian pickett railing, sidewalk and signage.

SR A1A & Mickler Rd. Photo Gallery

Stacks Image 2062
Stacks Image 2064
Stacks Image 2068
Stacks Image 2070
Stacks Image 2072
Stacks Image 219
Gibbs & Register, Inc.
232 South Dillard Street
Winter Garden, Florida 34787
Office: 407-654-6133
Facsimile: 407-654-6134